
Gallup, NM · Electrical Transformer Buyers
Electrical Transformer Buyers in Gallup, NM
We purchase transformers throughout Gallup and the surrounding New Mexico market. That includes equipment still energized and scheduled for replacement, equipment already isolated after a shutdown, and whole electrical rooms coming out of a building change. We buy it and we remove it — one offer, one crew, one certificate of insurance.
Request a Quote
Get a Written Offer
Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.
Faster: call 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm CT. We never resell your contact information.
- Location
- Gallup, NM
- Desk
- Electrical Transformer Buyers
- Ratings
- 75 kVA – 50 MVA
- Offer
- Same business day
- Payment
- Before load-out
- Phone
- 954-740-1983
Local service
Transformers buyers serving Gallup
We treat New Mexico as a single service area instead of a list of towns. That is why a single item in Gallup is still worth quoting — it gets added to an existing run between Albuquerque, Las Cruces, Rio Rancho and Santa Fe rather than priced as a dedicated trip.
The sequence is short. You send nameplate photos, a one-line diagram or just a list. We return a written itemized offer the same business day with a proposed removal window. On acceptance we survey access in Gallup — door widths, floor loading, dock, elevator, crane needs — then mobilize, lock out, disconnect, rig, load and sweep. Payment before the truck leaves.
| Item | Detail |
|---|---|
| Ratings | 75 kVA – 50 MVA, oil-filled and dry-type |
| Scope | Pad-mount, dry-type, cast coil, substation |
| Nameplates | ABB, General Electric, Square D, Eaton, Cooper, Howard, Federal Pacific, Siemens, Waukesha, Kuhlman, Westinghouse, Delta Star, Pennsylvania Transformer, Hammond, Acme |
| Condition | Working, retired, water-damaged or already dismantled |
| Minimum | One section, one unit, or a whole plant lot |
Equipment
What we take out of Gallup sites
Liquid-filled pad-mount and station class
Oil-filled pad-mount and pole-mount units, loop-feed and radial, unit substations with their primary switching and secondary sections, and station-class power transformers with tap changers, radiators and conservators. Oil is tested for PCB content before anything moves, and the manifests come with your paperwork.
Dry-type and cast coil
Ventilated dry-type and cast-coil units from 15 kVA through 5 MVA, including 480 V to 208 V step-downs, K-rated units specified for harmonic loads, and drive isolation transformers. Dry-types move easily, resell quickly and generally carry a strong number relative to their weight.
New Mexico specifics
National laboratory and utility work at Albuquerque and Los Alamos produces documented switchgear and transformer disposition, and oil-patch activity in the southeast adds classified-area gear.
Nearby
Nearby and related
We cover New Mexico statewide, so if the equipment is not in Gallup itself, one of these is probably closer:
Common questions
Gallup questions
Do you provide documentation for surplus property or audit records?
Yes. Itemized purchase agreements, weight tickets, bills of lading, oil disposal manifests and recycling documentation are standard on Gallup purchases. Public agencies and audited facilities get the paperwork their process requires without having to ask twice.
Do you actually buy electrical equipment in Gallup, or just broker it?
We buy it. Texas Electrical Equipment Buyers is the purchaser of record — we fund the purchase, send our own crews to Gallup to disconnect and load, and take title when the equipment leaves your dock. There is no third party behind us waiting to approve the price.
What is the smallest job you will take in Gallup?
A single transformer, one switchgear section, a pallet of breakers or a few boxes of breakers is worth a call. Because we route crews across New Mexico continuously, small Gallup pickups usually get added to an existing run rather than priced as a dedicated trip.
How fast can you get to a Gallup site?
Written offers go out the same business day in nearly every case. After acceptance, typical mobilization to Gallup is a few business days for a straightforward removal and one to two weeks for a full plant scope that needs phasing, rigging plans or utility coordination.
Do we have to disconnect the equipment before you arrive?
No. We handle removal. Your electrician or the utility performs the final isolation and we verify it; from there our crews lock out, cut and cap cable at the gland, unbolt the sections, skate them out and load them. If the Gallup room is still partly live we phase the work.
Transformers in Gallup?
One call, one written offer, one crew. Payment before the trailer leaves.